Living Health Lab

An open source project to help people examine, understand, and improve their day-to-day health through guided exploration, self-tracking, and behavior change.

Design
With over 350,000 digital health applications available worldwide, there's no shortage of options when it comes to individual health data tracking.1 However, accurately interpreting this data to address specific questions and create an effective health plan can be a challenge. Individuals within the Quantified Self community have established a systematic approach to self-tracking and self-research called Personal Science. Through Living Health Lab, we aim to extend the personal science process to anyone with access to a smartphone.

Development
Living Health Lab will be an open source tool that helps individuals notice a health problem, identify possible contributing or alleviating factors, and test any causality. The process will be guided by the individual's goals and what phase of their Health Journey they are in. They will also be encouraged to designate a health buddy (e.g., a partner, clinician, or friend) to accompany them in their explorations and analyze findings together.

Dream
Our goal is to make Living Health Lab available to anyone who asks "How can I pursue a healthier life?", as a tool that empowers every patient, supplements the care of all medical providers, and promotes a holistic approach to healthcare. This resource will be an open source design project that is freely shared with the public. As we are still in the early stages of the design process, we would welcome any feedback: please reach out to us at LivingHealthLab@goinvo.com.

Living Health Lab Workbook

Get the Workbook

We created this printable to demonstrate what a Living Health Lab app could support in the future. The workbook is designed to guide you through identifying, tracking, and better understanding your health concerns.

View The Workbook

Introduction

Chronic pain is a condition that affects over 50 million adults in the United States.2 For many, managing chronic conditions is a difficult process that involves a complex jumble of biological, physical, emotional, mental, social, and cultural factors. With more than 350,000 health and wellness-related applications available to download worldwide, patients can easily monitor their health, yet very few of these services help patients with chronic health problems interpret their data or offer insights to improve everyday health.1

1 in 5 adults experience chronic pain

At least 1 in 5 adults in the U.S. live with chronic pain3

Migraines statistics

3-4% globally experience chronic daily headaches4

Arthritis statistics

15 million experience arthritis pain5

IBS statistics

24-45 million experience IBS symptoms6

Out of all chronic pain patients, one in three individuals faces frequent limitations in daily life due to the severity and frequency of their symptoms.2 These patients often undergo repeated attempts to manage their conditions. This can mean frequent visits to the doctor's office and ER, several trials of different medications, and multiple days of missed work due to disability, all of which take a toll on their interpersonal relationships, financial stability, and overall quality of life.7 Members of a community called Quantified Self found inspiration in this disheartening cycle through a self-tracking approach now known as personal science: they became "active investigators" of their own health.8 This method encourages patients to seek answers to their own difficult health questions and concerns through five key actions of self-research9:

Step 1: Question

1. Question experiences, emotions, observations about one's own life

Step 2: Design

2. Design the exploration

Step 3: Observe

3. Observe the data collected, manually self-reported or collected by smart devices

Step 4: Reason

4. Reason through the findings

Step 5: Discover

5. Discover practical actions to improve daily life and share with others

In our review of published work in the fields of personal science and self-tracking, we found that this approach has helped individuals with specific chronic conditions, including patients with Parkinson's disease in identifying personalized sleep and medication routines to improve symptoms of rigidity,10 patients with irritable bowel syndrome in determining possible food triggers,11,12 and patients trying to understand and better manage their migraines.13 Living Health Lab's mission is to build on this research and broadly apply the process of personal science to patients with all types of health conditions, habits, and concerns. It will help anyone with a smartphone discover how to improve their day-to-day health through guided, thoughtfully-designed explorations.

Design

Living Health Lab project timeline

1) Design Principles

The following design principles are based on findings and reflections from the Quantified Self and broader self-tracking communities, combined with lessons from our own experiences designing for patients. These principles serve as a compass as we begin designing and prototyping Living Health Lab.

  • Purposeful Exploration
    • Figure out where the individual is in their Health Journey and where they want to go
    • Align the exploration with their goals, limitations, and needs
    • Reduce the burden of tracking as much as possible
  • Guided, Informed Experience
    • Ensure that designing the exploration is a clear, easy process
    • Give people knowledge and control over what they commit to
    • Use storytelling and visualization to bring the content to life
    • Design an accessible personal science learning experience
  • Collaborative Health
    • "Do health together" with a network of support by including the person's care team: PCP, other providers, accountability buddy, and friend/family "cheerleaders"
  • Actionable Insights
    • Identify factors impacting their health
    • Provide meaningful data visualization
    • Offer insights that enable patients to make improvements to their health
  • Sense of Agency
    • Support self-reflection and self-learning
    • Empower patients to be in the driver's seat of their own health
    • Recognize the value of all new insights, irrespective of "success"

2) Visualizing the Patient Experience

Storytelling is a powerful tool to represent the patient experience. Here we use Patty's Story as a way to begin conceptualizing and defining the Living Health Lab service. This is just one illustration of how an individual could discover Living Health Lab and begin taking ownership of their health through the service.

Patty's Story comic panel 1 of 6

3) Paper Prototype: The Workbook

In Stage 2, we realized we needed to test our approach firsthand. We took our learnings from Stage 1 and created a printable version of Living Health Lab. This workbook guides the user towards the exploration that best suits their needs based on our research (read more about the Health Journey below). It helps the person refine what to track, when, for how long, and who can help keep them accountable. The workbook includes space to record data manually followed by a short guide for reflecting on what they've learned after the exploration is over. Four of us on the team used the workbook to conduct our own self-tracking experiments. With our own experiences and feedback from colleagues, we refined the draft into this current iteration.

Paper prototype 1 of 3

Early results
Our experiments with the workbook taught all of us more about our health. One member of our team realized their health condition was more serious than they had thought and decided to seek professional help. Another discovered a healthy habit that significantly reduced pain and has been living with less pain since. The time-bound nature of the exploration made it more doable as expected, and the planned group check-in at its conclusion created additional accountability.

However, the experience was also far from perfect. For many of us, it was hard to keep track of the physical paper and remember to log our data daily. Even with the guide, it can still be challenging to find creative ways to test hypotheses in our fast-paced lives. In general, it is challenging to take the initiative to focus on our health and prioritize this kind of exploration.

How might we address these problems in the future?

  1. Integration of technology: a conveniently-timed text prompt might improve consistency of day-to-day tracking.
  2. Professional Support: increasing personal motivation to prioritize health and utilize the workbook can be difficult. Ideally, a professional (e.g., health coach or therapist) could use Living Health Lab to guide the patient through the process.
  3. Accessibility: we can also make the workbook easier to use by lowering the reading level, simplifying the workbook further, or translating it into other languages. We will continue to brainstorm new ways to make personal science more accessible.

Try it out
This is still an early version, and we recognize that it is not fully accessible to all as it requires comfort level with science and significant self-motivation and bandwidth to use on one's own. However, we're excited to share the workbook with you all. Please take a look and share your feedback with us at LivingHealthLab@goinvo.com

4) Next Steps: Digital Design

The insights from our paper prototype tests are driving the digital design phase. After our experience with the workbook, the team feels the Living Health Lab approach has real potential to create meaningful changes. The digital version aims to solve the key challenges we faced: remembering to track, being creative in testing, and turning data into insights.

Digital design update 1 of 3

Making personal science accessible is no small task. Here are the top four challenges with this type of digital service based on our research and review of similar tools:

  • a) Helping the patient set up the right exploration
  • b) Reducing the Tracking Burden
  • c) Making Personal Science Accessible and Understandable
  • d) Providing Actionable Insights and Appropriate Analysis

a) Helping the patient set up the right exploration

Tracking a wide range of factors without clear goals runs the risk of overburdening; this is why it is critical to ensure that each exploration is designed to closely align with patient goals. Setting up the right exploration is no simple task. With so many different health concerns and questions, there is no one-size-fits-all exploration. Researchers Munson et al. explore how crafting the exploration around the patient's goals leads to the best results.14 These goals can be distinct from those of their doctor or the intentions of the tool's designers, and they can change over time as the patient learns more. Additionally, patients may need support to clarify and define their goals, as their goals may initially be undefined or unachievable. Through simple questions, Living Health Lab will direct individuals toward the self-tracking strategy that best aligns with where they are in their own “Health Journey.”

The Health Journey

We propose the Health Journey as a general framework for how an individual can shift from a lack of awareness of a health problem to finding healthy habits to manage that problem daily. Our research is only just beginning, and we want to recognize that this framework would not have been possible without the research that's already been done—we are particularly grateful to those in the Quantified Self as well as all the researchers in the patient self-tracking space for their foundational work.8,14,11,12

b) Reducing the Tracking Burden

Any given individual is more likely to reach their tracking goal if it fits easily into their life. A purposeful, well-defined exploration reduces the burden by keeping tracking focused. While factors like mood or symptom reporting may need to be manually reported, other data can be automatically gathered. With the patient's consent, Living Health Lab can gather data from their phone, wearables, smart devices, health apps, and more. Living Health Lab will likely suggest automated options wherever possible and limit manually reported factors to minimize the tracking burden.

Living Health Lab can also reduce the tracking burden by providing timely insight and options as the user sets up their exploration. As they choose what to track, they will be given an estimate of how many minutes tracking will take daily to prevent overcommitment. The individual can also designate the duration of the exploration, with options ranging from one to three weeks. We hope to reduce the tracking burden and make health explorations feasible for many people. However, we also will need to validate this hypothesis and develop additional measures through user testing.

c) Making Personal Science Accessible and Understandable

Living Health Lab will use multiple approaches to make the experience accessible to a wide range of patients. Assuming that the individual has no prior knowledge of science or statistics, Living Health Lab will infuse clear science tips and ways to learn more, provide clarity into the process, and integrate animation and other visual aids to support understanding. Additionally, content should be written at a fifth-grade reading level.15 Balancing thorough patient education with simplicity is a primary challenge that we acknowledge.

d) Providing Actionable Insights and Appropriate Analysis

Living Health Lab can become a space for patients to engage in activities that strengthen their knowledge, skills, attitudes, and confidence in managing their health. The Health Journey framework supports a progression from noticing to testing new habits, which leads to valuable insight and meaningful behavior change. Much of the value of the personal science process comes from the patient's own reflection, drawn out by good questions and bolstered by the support of others. However, Living Health Lab will also need to provide insight into the data to help patients avoid incorrect conclusions and make sense of what they have tracked. Any analysis that Living Health Lab provides must be clear without over-reaching. We recognize that this balance will be a key challenge to overcome.

Even when an exploration doesn't produce clear findings or show a correlation between factors, an individual can still come to new realizations about their Health Journey. Wolf et al. found that “ancillary benefits include deeper learning about a health topic; generation of new ideas for improving their own care; productive engagement with clinicians; and providing a sense of agency while dealing with the stress of disease and treatment.”9 Regardless of the results for any given exploration, a person can still learn in the process. Ultimately, the goal is for Living Health Lab to help patients see their health and take action to improve their day-to-day health.

Making Living Health Lab Real

Broader application for patients and providers

We believe this empowered approach to managing one's health is beneficial for every human. Initially, we plan to target those living with chronic conditions that can make everyday life difficult, like fibromyalgia, arthritis, and migraines. Research has shown those with chronic conditions are often the most motivated to start the tracking process as any insight can directly affect their day-to-day health.11 Patients who are highly motivated to answer their health questions and have much to gain may be the easiest to reach, but many others could also benefit from Living Health Lab:

User tracking chart

Living Health Lab will be a collaborative tool for patients and their doctors as they "identify new trends, hypothesize about symptom contributors, generate action plans, and identify new information needs" for chronic condition management and healthy lifestyle promotion.13 This type of collaboration is most successful when both parties share their clearly defined goals. Access to high-quality, patient-generated data might free up the office visit to discuss more targeted concerns as patients come in to share their findings and receive personalized interpretation and direction.16 We see the opportunity for Living Health Lab to facilitate higher levels of patient engagement in their healthcare and make it easier for providers to obtain data on their patients' day-to-day health.

Living Health Lab will guide people in identifying and understanding their unique, necessary lifestyle changes and the ideal way to implement them. Lifestyle changes could prevent one out of every three premature deaths related to heart disease, stroke, and chronic lung disease.17 "Eat better," "Move more," and "Smoke less" are just a few of the most common generic lifestyle recommendations. Though accurate, simply dispensing this advice is rarely sufficient in effecting change. So how can we set people up for success in each person's unique context? Providing concrete, actionable steps based on their lived experience is the key. In several observational studies and clinical trials, non-medicine approaches like exercise, mindfulness, and mind-body practices have demonstrated improvement in chronic pain experienced by people (see appendix i - Non-medicine Pain Relief Research Summary). Our work builds on these findings to apply it in real world terms. Living Health Lab takes the recommendation to eat better and prompts the individual to determine the specifics of what that looks like for them. These guided self-tracking strategies give structure to the process of watching, measuring, and investigating choices. Living Health Lab will show people how capable they are of taking control of their own health.

We hope to serve everyone from the student in a high school health class to the retiree trying to improve their heart health to the single parent struggling with their newborn's skin sensitivities. Living Health Lab reaches those with medical diagnoses and extends to everyone who asks "How can I pursue a healthier life?" Some will ask that question on their own, while others will be advised by their doctor, nurse, or others on their care team. Living Health Lab can be an extension of those conversations as it leads people to explore their own health and seek answers.

Open Source Health Design

As an Open Source Health Design project, Living Health Lab content will be available to the public for free use under the Creative Commons Attribution 4.0 International License. Transparency affords us the benefits of external input and engagement. By making all research, design, and ultimately code publicly available, we hope to spread good ideas and accelerate innovation for the public good.

Get Involved

We are in the early stages of design and funding will be a vital component for continuing this project. If you're interested in contributing, partnering, sponsoring, or simply sharing feedback, please reach out to us at LivingHealthLab@goinvo.com.

Appendix

i - Non-medicine Pain Relief

Non-medicine pain relief research 1 of 3

ii - Research Table

Authors

Sharon Lee

Sharon Lee, GoInvo

Sharon is a designer with an eclectic background in engineering, medicine, and art. Passionate about healthcare, she has focused her efforts on human-centered software design. She joined Invo in 2016 with a BS in Biomedical Engineering from the University of Virginia.
Shayla Nettey

Shayla Nettey, GoInvo

Shayla Nettey is a physician with a taste for design. Her focus on community medicine and patient education pushes her public health goals where all patients better control their health with help from happier, skilled clinicians. Shayla joined Invo in 2021, is a graduate of Morehouse School of Medicine, and practices as a hospitalist in North Carolina.
Huahua Zhu

Huahua Zhu, GoInvo

Huahua is a designer who tells stories through illustration, animation and comics. She creates beautiful narratives to show how our healthcare should be treating all of us. She joined Invo in 2022 with a BFA from Rhode Island School of Design.
Megan Hirsch

Megan Hirsch, GoInvo

Megan is a designer-strategist that makes healthcare experiences enjoyable for patients and clinicians. She's dialing in her design and biology-trained eye to amplify her medical school experience in 2022. She joined Invo in 2021 with a BS in Human Biology from Stanford University.
Chloe Ma

Chloe Ma, GoInvo

Chloe is a designer and researcher specializing in medical and scientific storytelling. She drives to improve healthcare equity, education, and accessibility through good design. Chloe joined Invo in 2021 with a BS in BioChemistry and Molecular Biology from Dalhousie University and a MSc in Biomedical Communication from University of Toronto.
Samantha Wuu

Samantha Wuu, GoInvo

Sam is a writer, editor, and resident People Person at GoInvo. She previously worked at NYC Health + Hospitals on the migration of the provider credentialing process to a digital platform. A middle school English teacher in a past life, Sam is also a lifelong detail enthusiast and fan of diversity (of both people and punctuation). She joined Invo in 2022 with a BA in English from Barnard College and an MEd from Harvard University.
Arpna Ghanshani

Arpna Ghanshani, GoInvo

Arpna is a designer with a background in data science and public health. She strives to create beautiful, data-driven primary self care services and improve access to healthcare. She joined Invo in 2022 while completing her BA in Data Science and BA in Public Health at the University of California, Berkeley.
Jenny Yi

Jenny Yi, GoInvo

Jenny is a designer of urban infrastructures that impact public health. She designs spaces that incorporate new healthcare technologies to create seamless experiences for people's access to healthcare services. She joined Invo in 2022 with a B.Arch from Cornell University and a M.Des from Harvard Graduate School of Design.

Contributors

Jenny Yi

Jenny Yi, GoInvo

Jenny is a designer of urban infrastructures that impact public health. She designs spaces that incorporate new healthcare technologies to create seamless experiences for people's access to healthcare services. She joined Invo in 2022 with a B.Arch from Cornell University and a M.Des from Harvard Graduate School of Design.

Subscribe to our newsletter

You'll receive our latest ideas, visualizations, and studio news delivered to your inbox twice a month.

References

  1. 1.IQVIA Institute for Human Data Science. Digital Health Trends 2021: Innovation, Evidence, Regulation, Adoption. 2021. Accessed June 7, 2022.: https://www.iqvia.com/insights/the-iqvia-institute/reports/digital-health-trends-2021
  2. 2.Zelaya CE, Dahlhamer JM, Lucas JW, Connor EM Chronic Pain and High-impact Chronic Pain Among U.S. Adults, 2019. NCHS Data Brief no 390. National Center for Health Statistics. 2020. Accessed June 7, 2022.: https://www.cdc.gov/nchs/products/databriefs/db390.htm#section_1
  3. 3.Zelaya CE, Dahlhamer JM, Lucas JW, Connor EM. CDC/National Center for Health Statistics. Chronic Pain and High-impact chronic pain among U.S.. adults, 2019. Updated November 4, 2020. Accessed June 26, 2022: https://www.cdc.gov/nchs/products/databriefs/db390.htm
  4. 4.Stovner Lj, Hagen K, Jensen R, Katsarava Z, Lipton R, Scher A, Steiner T, Zwart JA. The global burden of headache: a documentation of headache prevalence and disability worldwide. 2007 Mar;27(3):193-210. doi: 10.1111/j.1468-2982.2007.01288.x.: https://pubmed.ncbi.nlm.nih.gov/17381554/
  5. 5.Centers for Disease Control and Prevention. Joint Pain and Arthritis. Updated April 22, 2022. Accessed June 26, 2022 (archived link): https://web.archive.org/web/20220409214441/https://www.cdc.gov/arthritis/pain/index.htms
  6. 6.International Foundation for Gastrointestinal Disorders. IBS Facts and Statistics. Accessed June 26, 2022: https://aboutibs.org/what-is-ibs/facts-about-ibs/
  7. 7.Institute of Medicine (US) Committee on Advancing Pain Research, Care, and Education. Relieving Pain in America: A Blueprint for Transforming Prevention, Care, Education, and Research. Washington (DC): National Academies Press (US); 2011. doi: 10.17226/13172
  8. 8.Wright A. Self-Tracking: Reflections from the BodyTrack Project. Sci Eng Ethics. 2018;24:999-1021.: https://doi.org/10.1007/s11948-016-9801-2
  9. 9.Wolf GI, De Groot M. A conceptual framework for personal science. Front Comput Sci. 2020;2:21. doi: 10.3389/fcomp.2020.00021
  10. 10.Riggare S, Hagglund M. Precision Medicine in Parkinson's Disease - Exploring Patient-Initiated Self-Tracking. J Parkinsons Dis. 2018;8(3):441-446. doi:10.3233/JPD-181314
  11. 11.Karkar R, Schroeder J, Epstein DA, et al. TummyTrials: A Feasibility Study of Using Self-Experimentation to Detect Individualized Food Triggers. Proc SIGCHI Conf Hum Factor Comput Syst. 2017;2017:6850-6863. doi:10.1145/3025453.3025480
  12. 12.Karkar R, Zia J, Vilardaga R, et al. A framework for self-experimentation in personalized health. Journal of the American Medical Informatics Association. 2015;23(3):440-448. doi:10.1093/jamia/ocv150
  13. 13.Schroeder J, Karkar R, Murinova N, Fogarty J, Munson SA. Examining Opportunities for Goal-Directed Self-Tracking to Support Chronic Condition Management. Proceedings of the ACM on Interactive, Mobile, Wearable and Ubiquitous Technologies. 2019;3(4):1-26. doi:10.1145/3369809
  14. 14.Munson SA, Schroeder J, Karkar R, Kientz JA, Chung CF, Fogarty J. The Importance of Starting With Goals in N-of-1 Studies. Frontiers in Digital Health. 2020;2. doi:10.3389/fdgth.2020.00003
  15. 15.Aldridge MD. Writing and designing readable patient education materials. Nephrology Nursing Journal: Journal of the American Nephrology Nurses' Association. 2004;31(4):373-377. Accessed June 15, 2022.: https://pubmed.ncbi.nlm.nih.gov/15453229/
  16. 16.Chung CF, Wang Q, Schroeder J, et al. Identifying and Planning for Individualized Change: Patient-Provider Collaboration Using Lightweight Food Diaries in Healthy Eating and Irritable Bowel Syndrome. Proc ACM Interact Mob Wearable Ubiquitous Technol. 2019;3(1):7. doi:10.1145/3314394
  17. 17.Centers for Disease Control and Prevention. Up to 40 percent of annual deaths from each of five leading causes are preventable. 2014. Accessed June 3, 2022. (archived link): https://web.archive.org/web/20220526205537/https://www.cdc.gov/media/releases/2014/p0501-preventable-deaths.html